The National Robotarium, Edinburgh

Details
X

Get in touch

Summary

Sector
Research
Value
£14.9m
Location
Edinburgh
Status
Completed
Customer
Heriot-Watt University and The University of Edinburgh
Completion
May 2022
Get social and share

Building the home for world-leading robotics and artificial intelligence in the UK

The National Robotarium is a ground-breaking and instantly recognisable centre for robotics; as exciting, innovative, and ambitious as the work carried out inside this impressive building.

6,000 m3

stone foundations

2

robotic dogs

1

BBC Click TV appearance

A panel highlighting at The National Robotarium's won Project of the Year at the Learning Places Scotland Awards 2023.

Creating innovative and sustainable spaces for a futuristic industry

With a striking two-storey 141 glass panel double skin facade, The National Robotarium is a remarkable building which gives an unforgettable first impression.

But the glass exterior isn't just for show – the south-facing building's double skin creates a buffer zone between the interior and the outdoor temperatures, which traps the heat and distributes it inside, significantly reduces energy consumption.

And similarly clever building design elements are at play throughout this revolutionary structure.

The pond at the front of The National Robotarium has also been created with sustainability in mind. An intelligent drainage network from the roof and surrounding areas allows rainwater to funnel into the pond, serving as a sedimentation tank and a student research biodiverse project space.

But the most impressive part of The National Robotarium is the central atrium, which has become known as The Forum. The 247m2 space enjoys six geometrical skylights that allow natural light to enter the building, creating an airy and vibrant area within the heart of the building.

This multi-functional open collaborative space allows the teams working within The National Robotarium to collaborate, sharing ideas and expertise for the benefit of the robotics industry and wider society.

The glass facade at the front to The National Robotarium in Edinburgh.

In addition to this bright and open space, The National Robotarium also has a three-room model home built inside, allowing assisted technology to be tested in a home environment. And four labs allow for robotic engineers to work in safe, collaborative, and versatile spaces.

The National Robotarium is now a centre of excellence for robotics in the UK, fast becoming well-known around the world, and the building itself forms an essential part to their identity and global brand.

The internal atrium at The National Robotarium, known as The Forum.

The facade itself gives us instant recognition and it's becoming an important part of our brand. There was always the desire by the Robertson team to push on and get things done. I saw them innovate and be creative about how to solve problems and work around things.
Stewart Miller
CEO

Teaming up with robotic dogs

In a first for Robertson, we arranged site visits for the university's robotics department's Boston Dynamics robot dogs, allowing customers, students, and visitors to take videos and pictures.

The remote-operated robots M.A.R.T.I.N.A (Mechanical, Artificial, Remote, Technological, Intelligent, Ninja, Arm) and M.A.R.T.I.N created 3D mapped environments of the construction site, allowing detection of any clashes between the build and designs, also advancing scientific research in the use of robotics in the construction industry.

Finding creative safety solutions

You can't tell by looking at it, but construction of this unique building did not come without its challenges. Creating the iconic Forum space within The National Robotarium required the installation of a 230m2 working platform during the build to allow access. Seven meters above ground level, this temporary fixture increased productivity by allowing access, and secured the Health and Safety of our staff by greatly reducing the risk of working at height and dropped objects.

Significant thought was also given to traffic and vehicle access throughout the construction. Tar was laid in the early stages to introduce a storage area and allowed vehicles and plant to travel with limited disruption for pedestrians. This also benefited from an environmental perspective as vehicles were not traveling through mud, which could have been taken on to the University roads.

These steps were all taken to make the construction process as positive for our customers, and their staff and students, as possible. We always carefully consider what safety steps we can take to limit disruption on all our projects and we're proud of our safety record. And this attention to detail and focus on safety paid off as there were no accidents associated with this project at all.


The building itself is an absolutely fantastic place to be. Everyone who comes here comment on it, and it's become quite a point of pride. We take people on tours of the building, and we all have our favourite spaces.