Timber kits supplied for affordable rented housing, Aberdeen

Details
X

Get in touch

Summary

Sector
Affordable housing
Value
£14m
Location
Aberdeen
Status
Completed
Customer
Grampian Housing Association
Completion
September 2020
Get social and share

Robertson Timber supplied the timber kits for 101 new affordable homes in Aberdeen.

Robertson Timber Engineering completed the design, manufacturing, and erection of 101 Key Worker Apartments in Aberdeen’s Burnside Gardens. These apartments span across 5 blocks at Foresterhill Court and were delivered on time and on budget. Manufactured at our Elgin factory, these structures showcase joist cassettes, ensuring quality and precision. The timely delivery and erection on-site exemplify our commitment to meeting project deadlines and exceeding client expectations.

Affordable rented housing for Aberdeen’s key workers

Robertson delivered new affordable rented apartments Aberdeen for Grampian Housing Association. The apartments are targeted at key workers in the NHS and other public sector organisations.

The project 55 two-bedroom and 46 one-bedroom flats are across six blocks, which are a mixture of three and four storeys. The development is a mix of mid-market rent (58 units) and social rent (43 units).

Redeveloping this site at Foresterhill Court will meet the demand for affordable rented accommodation in Aberdeen well as enhance the local area.

Key Facts:

  • 2858m2 gross internal floor area.
  • Timber frame construction.
  • Render and roughcast finish with cedar feature cladding.
  • Kitchens meet housing for varying needs specifications.
  • Landscaped grounds and an informal courtyard.
  • Associated infrastructure and substation power supply.
  • Designed to assure a sustainable future

The housing has been designed by Halliday Fraser Munro both to enhance the local surroundings as well as with sustainable living at its heart. One parking space is dedicated to a car club vehicle, while two electrical vehicle charging points and a communal external bicycle store for up to 110 bicycles, promoting sustainable travel.

Terminating old and creating new power supplies

As the site was previously owned by NHS Grampian with a dedicated substation to support their infrastructure, it was necessary to first terminate and redirect all the old power supplies.

We then created an entirely new dedicated power supply for this residential development. The works comprised electrical services separation, and the installation of a new substation and switchgear with new high voltage and low voltage cables.

Enabling works also included temporary fencing at the site boundary, demolition of an existing accommodation block and bowling club building and protection of existing trees.